by jmunson | Dec 21, 2017 | Project Journals
Folded Bar A Step-by-Step Project Journal of Joe's Design, Fabrication and Installation Folded Bar: Working With Existing FeaturesThis is the condition that we essentially started with. The client had attempted to do a bamboo bar here but it was not up to their...
by jmunson | Dec 21, 2017 | Project Journals
Integrated Bottom Up Shade A Step-by-Step Project Journal of Joe's Design, Fabrication and Installation Integrated Bottom Up Shade: Aluminum Extrusion Outer FrameOur integrated bottom-up shade apparatus consists of an aluminum extrusion outer frame that contains...
by jmunson | Dec 21, 2017 | Project Journals
Scholastic Trophy & Display A Step-by-Step Project Journal of Joe's Design, Fabrication and Installation Scholastic Trophy & Display: Cutting & Fluting Acrylic PartsThis was a rush project with only five weeks from design to completion. The piece had to be...
by jmunson | Dec 21, 2017 | Project Journals
Hull Work Table A Step-by-Step Project Journal of Joe's Design, Fabrication and Installation Hull Work Table: Waterjet Cut Steel PanelsHere are the ½” thick hot rolled steel waterjet cut side panels/leg parts from my supplier. They needed a lot of TLC for sure. Notice...
by jmunson | Dec 21, 2017 | Project Journals
AV1 A Step-by-Step Project Journal of Joe's Design, Fabrication and Installation AV1: Mounting ComponentsI’m starting this blog with quite a bit of this piece already framed up. I received the water jet ¾” thick steel base plate and mounted the vertical 6”x8” steel...